Construction & infrastructure

Where new infrastructure meets existing works

An infrastructure contractor was taking over a partly built project. Its contract called for insurance on the work it would carry out. Some of that work would connect directly to structures already in place.

An elevated view of a bridge under construction, with formwork, cranes and concrete supports.
Illustrative photograph

Which structures would the contractor retain? How would they be valued? And how would the policy distinguish a defect already present from damage to other property during construction? SANAD reviewed the contract and the site survey with those questions in mind.

SANAD presented alternative ways of structuring the insurance and negotiated the wording with the insurer. The contractor accepted the arrangement. The issued Contractors’ All Risks certificate expressly described the integration of retained works into the project.

Tell us where the project stands and when you need an answer. The contract’s insurance clause or your current policy is a good place to start.