Set the value for each machine
A crane bought several years ago may cost considerably more to replace today. We check the insurer’s valuation requirements against your equipment register, including attachments where needed, then compare the excesses and settlement terms for damage and total loss.
Follow hired equipment between sites
An earthworks subcontractor may own its loaders and hire an excavator from a plant-hire firm. The hire agreement sets out who is responsible for the excavator and for how long. We compare that period with the policy and check loading, transport and use at the next site. We ask the insurer to confirm any extension needed before the machine moves.
Match the plant schedule to the motor policy
A low-bed trailer can have third-party motor cover for road use while its own damage is insured on the plant schedule. We match the item across both policies and identify which wording responds on the road, in transit and on site.

